Warren, MA

Client:
Warren Water District
Location:
Warren, MA
Project:
Water Treatment Facility
Division:
Mechanical Construction
Architect:
Tighe & Bond
Design Engineer:
Not Available
Construction Manager:
Not Available
Contract Value:
Not Available
Project Overview:
Construct new 0.5 MGD Greensand Iron and Manganese bwin casino reviewFiltration System for iron and manganese removal at existing Comins Pond Water Plant.
  • Pre-engineered 60’ x 60’ metal building to include heating, ventilation, plumbing, electrical, instrumentation and SCADA.
  • Install two new replacement submersible well pumps and motors at Well No.s 1 and 2 and redevelop the wells.
  • Modified and installed new site piping, site work for drainage, water, bwin casino reviewsewer, drain, electrical and all site/civil surface finishes.
  • 25,000 gallon backwash supply and 32,000 gallon backwash waste underground holding tanks to facilitate backwashing of pressure filters and disposal of backwash waste to adjacent sewer system.