Bwin casino login

Normandy Road, Framingham, MA

Client:
State of MA, City of Framingham, Eversource
Location:
Normandy Road, Framingham, MA
Project:
Site Work
Division:
Energy/Utility
Architect:
Not Available
Design Engineer:
CDM Smith
Construction Manager:
Not Available
Contract Value:
Not Available
Project Overview:

This is a cross-cell with Energy Central. The scope of our work on Normandy Rd. is to support the main project by performing all work necessary in and around the bore field in the Normandy Rd. parking lot. Removal of all existing asphalt from the parking lot. Install supply and return piping for the geothermal loop. Excavate and backfill for the pumphouse and retaining wall. Install all utilities for the pumphouse. Install and Bwin Casino bonusremove drilling platforms. Install manifolds, plumb in all piping, and connect the manifolds to the pumphouse. Re-grade the parking lot. Re-pave the parking lot. GPS was used for grading and layout to enhance precision.

Previous Project
Next Project

Have a project you'd like to discuss?

Let's Get Started